As civil engineering subconsultant to the architect, Gabor Lorant Architects, EEC provided property and utility data coordination, preliminary and final drainage calculations, preliminary and final grading plans, storm drain plans, water, sewer and fire line plans, paving plans, parking lot and sidewalk design, and a Storm Water Pollution Prevention Plan (SWPPP). The project scope was expanded to include grading and drainage documents for a new 230 stall parking lot. The new parking lot is located between Tahoe Avenue and North Campus Loop Road, east of Avery Road. A realignment of Tahoe Avenue was designed to accommodate a drop off area for the Bridget Building. Prior to completing the parking lot documents, EEC included water and sewer infrastructure documents to meet the needs of the Campus Master Plan.